Client: Mrs Carol Lennox
Contract:
Horselea Farm, Forgandenny
We converted a disused steading into two 4* holiday cottages. The clients property was next to the conversion so we had to maintain a tidy environment throughout. The cottages were to be let upon completion, our clients however had a range of choices given throughout the build to put their stamp on them. These properties are heated by geothermal heatpumps and all associated work was also carried out by AGB. |
|
Client: Mrs McCullagh
Contract:
Burnbank Terrace, Perth
To consult with the client and propose a range of kitchen designs suitable to the property. Once the design was agreed we installed a new kitchen and downstairs cloakroom. The control was phased to leave the existing kitchen operational while installing the new one. Phase two included renovation of the existing kitchen into a new utility room. Benefits of this contract were using our experience we managed to make the clients house work better for them improving their living quality. |
|
Client: Private Build
Contract: Madderty, New Village Hall
We provided our client with the site servicing and civil infrastructure for the new community hall. Works included installation of a 2km pipe line to a watercourse and soakaway system. We also installed a sewage treatment plant and ancillary works. Works like foundations, concrete floor slabs, manhole construction were also carried out. Our final mark is left by the kerbing, monoblocking and gravelling that surrounds the new community hall. |
|
Client: Mr and Mrs Prior
Contract:
Madderty, St. Davids
From receipt of the Architects drawings we fully constructed the house as designed. We offered our clients a multitude of choices throughout the build making them feel involved at each stage of the build. The design of the house was testing at times but we delivered a great end product. |
|
Client: Private Build
Contract:
Clarkshill, Forgandenny
Providing groundworks through to a complete build of a two bedroom dwellinghouse. |
|
Client: Hadden Construction Limited
Contract: Strathcarron Care Home, Dundee
Providing all infrastructure works for a new care home. Works include foundations, floor slabs, drainage, monoblocking and site finishings.
|
 |
Client: Private Build
Contract:
The Anderson, Redstone
Disused steadings were firstly demolished allowing site infrastructure works to be completed. Groundworks and full trades build were completed to produce a four bedroom new build with garage. |
 |
Client: Private Build
Contract: The Lamont, Redstone
Disused steadings were firstly demolished allowing site infrastructure works to be completed. Groundworks and full trades build were completed to produce a four bedroom new build with garage. |
|
Client: Private Build
Contract: Abernyte, Kennels Cottage
Provide groundworks and full trades build to provide an extension which matches existing building. |
|
Client: Culfargie Estates
Contract: Mill farm, Bandirran
Transformed store rooms into two new dwellings. This project involved incorporating existing buildings to match a new build finish. |
|
Client: DA Kennedy (Developments) Ltd
Contract: Bertha Park View, Inveralmond, Perth
Provided civils and groundworks to develop land into completed industrial unit. |
|
Client: WB Grieve Groundworks
Contract: Donavourd, By Pitlochry
Site infrastructure works which included large soakaway and sewage treatment works. Preparation of access road and plot accesses. |