
Perth, Burnbank Terrace
To consult with the client and propose a range of kitchen designs suitable to the property. Once the design was agreed we installed a new kitchen and downstairs cloakroom. The control was phased to leave the existing kitchen operational while installing the new one. Phase two included renovation of the existing kitchen into a new utility room. Benefits of this contract were using our experience we managed to make the clients house work better for them improving their living quality.




